From single machines to whole plants, turnkey delivery. Selection, installation, commissioning, training, and spare parts — all in one.

Complete Line PlanningTurnkey DeliveryLifetime Spare Parts Support
100+
Full-Line Projects
2-3 mo
Line Completion
Lifetime
Parts & Service
Turnkey
One-Stop Service
Pain Points

Are You Facing These Pain Points

  • Difficult equipment selection

    Facing many brands and configurations, unsure how to match capacity and process.

  • Long installation cycle

    Equipment interfaces from multiple manufacturers are not unified, causing on-site delays.

  • Process mismatch

    Equipment parameters do not match coating process requirements, affecting quality and capacity.

  • No after-sales guarantee

    Imported equipment is expensive to repair and hard to find parts; domestic equipment lacks service network.

Products & Services

Six Equipment Segments · From Single Machine to Plant

Dispersion, grinding, mixing, filling, testing and environmental fully covered

01

High-speed Disperser

Dispersion

Core equipment for coating pre-dispersion with high shear efficiency and stable operation.

02

Horizontal Bead Mill

Grinding

Fine grinding to control fineness and color paste dispersion consistency.

03

Mixing Kettle

Mixing

Multi-specification stainless steel kettles for different viscosity and process requirements.

04

Automatic Filling Machine

Filling

Semi-automatic/full-automatic filling lines to improve packaging efficiency and accuracy.

05

Testing Equipment

Testing

Viscometer, gloss meter, color difference meter, salt spray chamber and other lab instruments.

06

Environmental Equipment

Environmental

Dust removal, exhaust gas and wastewater treatment and other coating environmental supporting equipment.

Milestones

Four Milestones for Turnkey Delivery

Visualized progress at every stage

M-01

Site Survey

On-site survey, layout & capacity plan

M-02

Solution Design

Full line drawings & equipment selection confirmed

M-03

Build & Install

Standardized manufacturing, on-site installation

M-04

Training & Acceptance

On-site training for operation & maintenance, acceptance

Why JIASHILI

Why New & Expanding Plants Choose Us

Complete line planning

Provide integrated solutions from plant layout to equipment selection based on capacity, product and budget.

Modular design

Modular equipment combination for easy later expansion and line transformation.

Installation & commissioning

Professional team handles equipment positioning, piping, electrical commissioning and trial operation.

Operation training

Train production, maintenance and QC personnel to ensure independent and stable factory operation.

Process

Four-Step Plant Build, Worry-Free Turnkey Delivery

1

Site Survey

Understand plant conditions, product planning, capacity targets and budget range.

2

Solution Design

Issue equipment list, layout drawing, process flow and quotation.

3

Installation & Commissioning

Equipment arrival, installation, single machine commissioning and joint trial production.

4

Delivery & Training

Deliver operation manual, train personnel and establish spare parts list.

Cases

Real Service Cases

More Cases
Cambodia Arc de Triomphe Commercial Center
Cambodia, Arc de Triomphe Center

Cambodia Arc de Triomphe Commercial Center

Located in the core business district of Phnom Penh, Cambodia, this large-scale commercial complex operates under a tropical monsoon climate with annual temperatures exceeding 30°C, UV intensity reaching level 9, and annual rainfall surpassing 2000mm. The exterior walls must withstand intense UV radiation and persistent rain exposure, which easily causes coating powdering, cracking, and peeling; thus, the coatings require exceptional weather resistance and crack resistance. The technical plan adopts weather-resistant exterior paint as the main material, paired with specialized alkali-resistant primer and elastic crack-resistant topcoat. The self-crosslinking film-forming technology is employed to create a dense protective layer, meeting the construction requirements in high-humidity environments and preventing coating detachment caused by alkali penetration from the substrate. Prior to application, the wall surface undergoes grinding and dust removal to ensure a flatness deviation of no more than 3mm. During construction, the ambient temperature must be maintained between 20-35°C with relative humidity below 85%. The standard application procedure involves one coat of primer, two coats of topcoat, and one coat of finish, with the total dry film thickness reaching over 150μm. After completion, tests show the coating withstands over 2000 hours of artificial aging, with adhesion rated at grade 1, scrub resistance exceeding 10,000 cycles, and waterproof performance meeting Class I of GB/T 19250-2013 standards. The client praised the coating’s lasting color and excellent crack resistance, and a 5-year warranty is provided for subsequent maintenance.

Cambodia Chinatown
Cambodia, Chinatown

Cambodia Chinatown

Located in the core business district of Phnom Penh, Cambodia, this project is a large-scale commercial complex integrating shopping, dining and entertainment, with a total construction area of 120,000 square meters and over 36,000 square meters of exterior wall area. As the region has a tropical monsoon climate with high temperature, heavy rainfall and ultraviolet radiation intensity up to 1800 kWh/m² throughout the year, traditional exterior coatings are prone to fading and peeling, failing to meet the durability requirements for long-term use. Therefore, the project owner set extremely high standards for the weather resistance, crack resistance and decorative performance of the exterior coating. The technical plan adopts a three-layer composite coating system: the primer layer uses an alkali-resistant sealing primer with adhesion strength ≥5MPa to effectively block the penetration of alkaline substances from the wall; the middle layer is water-in-sand multicolor paint with particle size ranging from 0.1 to 0.3mm, featuring a covering power ≥98% to perfectly reproduce stone-like textures; the top layer is a weather-resistant exterior paint with artificial aging resistance time ≥6000 hours, and finally a transparent clear coat with solid content ≥45% is applied to form a dense protective layer via self-crosslinking film formation. Before construction, the substrate must be thoroughly treated to ensure its strength ≥10MPa and flatness error ≤2mm. After removing surface dust, oil stains and loose materials, the alkali-resistant sealing primer is applied. Once it dries completely, elastic crack-resistant putty is applied to utilize its crack-resistant property to offset the cracking risk caused by minor wall deformations. Then the water-in-sand paint is sprayed with a wet film thickness controlled between 0.8 and 1.2mm, and finally the clear coat is applied to guarantee leveling performance and avoid orange peel defects on the surface. After completion, third-party testing showed that the coating's artificial aging resistance time reached 6200 hours, far exceeding the designed requirement of 6000 hours; the crack resistance performance was tested to withstand substrate deformation of ≥1.5mm without cracking, and the covering power remained above 99%, perfectly replicating the texture of natural stone. This coating system demonstrates excellent stability in the high-temperature and high-humidity environment of Cambodia, with an expected service life of over 15 years, providing a reliable durable solution for exterior decoration of local commercial buildings.

Myanmar People's Assembly Hall
Myanmar, People's Hall

Myanmar People's Assembly Hall

This project involves a national-level public building in Myanmar that serves as a venue for parliamentary deliberations and official receptions. The exterior walls must withstand intense ultraviolet radiation and high humidity typical of the tropical monsoon climate, while the interior walls need to endure frequent human contact, imposing extremely strict performance requirements on coatings. The technical plan adopts a layered matching system: surface preparation involves grinding and dust removal to ensure the substrate meets specified roughness standards. First, an interior alkali-resistant primer with adhesion strength ≥ grade 1 is applied to block alkaline substances from seeping out of the wall, followed by applying 5-in-1 lotus leaf interior emulsion paint with a film thickness of 25μm. For the exterior, travertine art paint with a film thickness of 30μm is used to integrate decorative and protective functions. The construction process strictly follows standardized procedures: the substrate must be free of floating dust and loose particles prior to coating. The alkali-resistant primer is applied in two coats with a 2-hour interval between coats, the interior emulsion paint is applied in two layers to achieve a total film thickness of no less than 25μm, and the exterior art paint is sprayed after being troweled into shape, with environmental humidity controlled below 70% to guarantee good leveling properties. Post-completion tests show that the coating has an adhesion strength ≥ grade 1, withstands artificial aging for over 2000 hours, endures 2000+ scrub cycles, meets the Class I waterproof standard stipulated in GB/T 17219, and has a VOC content of only 28g/L, far below national limits, fully meeting the long-term usage requirements of the assembly hall.

FAQ

FAQ

From Single Machine to Whole Plant, One-Stop Equipment Delivery

Tell us your capacity target and get equipment selection and complete line solutions.

JIASHILI Coatings Group

Focusing on architectural & industrial coatings, waterproof & fireproof materials and raw material export, serving 30+ countries.

© 2026 JIASHILI Coatings Group. All rights reserved. ICP XXXXXXXX

Seven global production bases, serving the world