JIASHILI Coatings Group
Formula & Technology Sales

Proven Formula Technology Transfer & Sales

Buy the formula, and more importantly, buy the ability to land it. Providing mass-production-verified formulas, process SOPs, and on-site training.

Mass-Proven FormulasProcess SOP DeliveryOn-Site Training
60+
Proven Formula Systems
100%
Mass-Production Verified
20+
Countries Delivered
6-12 mo
Technical Support
Products & Services

Six Technology Systems · Choose on Demand

From architectural to functional coatings, ready for mass production

F-01
F-01 · Architectural

Architectural Coating Formulas

Mature systems including interior/exterior latex paint, stone-like paint and texture coatings.

F-02
F-02 · Industrial

Industrial Anti-corrosion Formulas

Epoxy, polyurethane and acrylic anti-corrosion systems for various substrates.

F-03
F-03 · Flooring

Floor Coating Formulas

Epoxy self-leveling, polyurethane ultra-wear-resistant and anti-static floor systems.

F-04
F-04 · Water-based

Water-based Systems

Low VOC water-based industrial and architectural coating formulas for environmental trends.

F-05
F-05 · Solvent-based

Solvent-based Systems

High solid solvent-based formulas with stable performance and wide construction window.

F-06
F-06 · Functional

Special Function Formulas

Fireproof, waterproof, anti-fouling, antibacterial and other functional coating technology packages.

Incubation

Four-Step Incubation to Mass Production

Engineers accompany you until you produce independently

STEP 01

Needs Diagnosis

Analyze target market & raw materials, set formula direction

STEP 02

Formula Lab Sample

Lab sampling & validation, full formula documentation

STEP 03

Pilot Scale-Up

Pilot run in partner plant, verify mass production process

STEP 04

Production Support

On-site support until stable output, after-sales follow-up

Why JIASHILI

Buy a Formula, and the Ability to Deploy It

Mass-production verified

All formulas have been verified in actual factory production and can be scaled up directly.

Process SOP

Provide complete process documents covering equipment, feeding, testing and quality control.

On-site training

Technical engineers train operators and QC personnel at the factory to ensure smooth production.

Continuous upgrade

Provide formula iteration and new material introduction support according to regulations and market changes.

Applications

Typical Applications

New Coating Factory

Production Line Upgrade

Export-oriented Factory

ODM OEM

Process

Four-Step Hand-Holding, One-Time Successful Start

01

Requirement Assessment

Clarify target market, product positioning, equipment conditions and capacity planning.

02

Formula Delivery

Provide formula details, raw material list, process SOP and quality control standards.

03

Trial Production Guidance

Engineers guide first batch trial production on-site or remotely to solve scale-up issues.

04

Mass Production Optimization

Optimize cost and performance based on actual data to establish stable capacity.

Cases

Real Service Cases

More Cases
Cambodia Arc de Triomphe Commercial Center
Cambodia, Arc de Triomphe Center

Cambodia Arc de Triomphe Commercial Center

Located in the core business district of Phnom Penh, Cambodia, this large-scale commercial complex operates under a tropical monsoon climate with annual temperatures exceeding 30°C, UV intensity reaching level 9, and annual rainfall surpassing 2000mm. The exterior walls must withstand intense UV radiation and persistent rain exposure, which easily causes coating powdering, cracking, and peeling; thus, the coatings require exceptional weather resistance and crack resistance. The technical plan adopts weather-resistant exterior paint as the main material, paired with specialized alkali-resistant primer and elastic crack-resistant topcoat. The self-crosslinking film-forming technology is employed to create a dense protective layer, meeting the construction requirements in high-humidity environments and preventing coating detachment caused by alkali penetration from the substrate. Prior to application, the wall surface undergoes grinding and dust removal to ensure a flatness deviation of no more than 3mm. During construction, the ambient temperature must be maintained between 20-35°C with relative humidity below 85%. The standard application procedure involves one coat of primer, two coats of topcoat, and one coat of finish, with the total dry film thickness reaching over 150μm. After completion, tests show the coating withstands over 2000 hours of artificial aging, with adhesion rated at grade 1, scrub resistance exceeding 10,000 cycles, and waterproof performance meeting Class I of GB/T 19250-2013 standards. The client praised the coating’s lasting color and excellent crack resistance, and a 5-year warranty is provided for subsequent maintenance.

Cambodia Chinatown
Cambodia, Chinatown

Cambodia Chinatown

Located in the core business district of Phnom Penh, Cambodia, this project is a large-scale commercial complex integrating shopping, dining and entertainment, with a total construction area of 120,000 square meters and over 36,000 square meters of exterior wall area. As the region has a tropical monsoon climate with high temperature, heavy rainfall and ultraviolet radiation intensity up to 1800 kWh/m² throughout the year, traditional exterior coatings are prone to fading and peeling, failing to meet the durability requirements for long-term use. Therefore, the project owner set extremely high standards for the weather resistance, crack resistance and decorative performance of the exterior coating. The technical plan adopts a three-layer composite coating system: the primer layer uses an alkali-resistant sealing primer with adhesion strength ≥5MPa to effectively block the penetration of alkaline substances from the wall; the middle layer is water-in-sand multicolor paint with particle size ranging from 0.1 to 0.3mm, featuring a covering power ≥98% to perfectly reproduce stone-like textures; the top layer is a weather-resistant exterior paint with artificial aging resistance time ≥6000 hours, and finally a transparent clear coat with solid content ≥45% is applied to form a dense protective layer via self-crosslinking film formation. Before construction, the substrate must be thoroughly treated to ensure its strength ≥10MPa and flatness error ≤2mm. After removing surface dust, oil stains and loose materials, the alkali-resistant sealing primer is applied. Once it dries completely, elastic crack-resistant putty is applied to utilize its crack-resistant property to offset the cracking risk caused by minor wall deformations. Then the water-in-sand paint is sprayed with a wet film thickness controlled between 0.8 and 1.2mm, and finally the clear coat is applied to guarantee leveling performance and avoid orange peel defects on the surface. After completion, third-party testing showed that the coating's artificial aging resistance time reached 6200 hours, far exceeding the designed requirement of 6000 hours; the crack resistance performance was tested to withstand substrate deformation of ≥1.5mm without cracking, and the covering power remained above 99%, perfectly replicating the texture of natural stone. This coating system demonstrates excellent stability in the high-temperature and high-humidity environment of Cambodia, with an expected service life of over 15 years, providing a reliable durable solution for exterior decoration of local commercial buildings.

Myanmar People's Assembly Hall
Myanmar, People's Hall

Myanmar People's Assembly Hall

This project involves a national-level public building in Myanmar that serves as a venue for parliamentary deliberations and official receptions. The exterior walls must withstand intense ultraviolet radiation and high humidity typical of the tropical monsoon climate, while the interior walls need to endure frequent human contact, imposing extremely strict performance requirements on coatings. The technical plan adopts a layered matching system: surface preparation involves grinding and dust removal to ensure the substrate meets specified roughness standards. First, an interior alkali-resistant primer with adhesion strength ≥ grade 1 is applied to block alkaline substances from seeping out of the wall, followed by applying 5-in-1 lotus leaf interior emulsion paint with a film thickness of 25μm. For the exterior, travertine art paint with a film thickness of 30μm is used to integrate decorative and protective functions. The construction process strictly follows standardized procedures: the substrate must be free of floating dust and loose particles prior to coating. The alkali-resistant primer is applied in two coats with a 2-hour interval between coats, the interior emulsion paint is applied in two layers to achieve a total film thickness of no less than 25μm, and the exterior art paint is sprayed after being troweled into shape, with environmental humidity controlled below 70% to guarantee good leveling properties. Post-completion tests show that the coating has an adhesion strength ≥ grade 1, withstands artificial aging for over 2000 hours, endures 2000+ scrub cycles, meets the Class I waterproof standard stipulated in GB/T 17219, and has a VOC content of only 28g/L, far below national limits, fully meeting the long-term usage requirements of the assembly hall.

FAQ

FAQ

Enter the Coating Market Quickly with Proven Formulas

Leave your project info to get formula technology solutions and landing support.

JIASHILI Coatings Group

Focusing on architectural & industrial coatings, waterproof & fireproof materials and raw material export, serving 30+ countries.

© 2026 JIASHILI Coatings Group. All rights reserved. ICP XXXXXXXX

Seven global production bases, serving the world